An ironing machine needs more than its published footprint. Linen must approach the feed area, move through the finishing process and leave in a direction that supports folding, stacking and onward handling.
Choose the Delivery Direction Deliberately
Front and rear delivery arrangements can create different operator paths and room layouts. Review our Line 6000 flatwork ironer range and decide which movement pattern fits the site before services and walls are fixed.
Measure the Working Envelope
Include feed tables, trolleys, operator positions, finished-linen handling and access for cleaning and service. Mark columns, doors and escape routes so the proposed line can be tested at scale.
Check the Delivery Route
- External delivery access
- Door and corridor dimensions
- Floor loading and level
- Turning space for equipment movement
- Removal path for future replacement
Review a Model Specific Example
If a 480 mm cylinder front-delivery configuration is under consideration, the IC64821 product page provides dimensions and documentation for that exact model. It is useful for space testing, but it should not substitute for a full capacity and site assessment.
Coordinate Utilities and Commissioning
Confirm power, ventilation, exhaust and other model-specific services with qualified parties. Allow time for commissioning, operator training and ongoing maintenance through our service agreements, and contact our Australian team for local equipment discussions.
Frequently Asked Questions
Is the machine footprint enough for ironer planning?
No. Include operators, linen movement, trolleys, service access and finished-work handling.
What is the difference between front and rear delivery?
They return or discharge linen in different directions, which changes workflow and space requirements.
Why check the equipment delivery route?
A suitable operating position is not useful if the machine cannot safely reach it.
Can a product page replace an installation survey?
No. It supports early comparison; final planning needs exact documentation and a site-specific assessment.
When should operators be involved?
Involve them while testing the proposed feed, discharge and trolley movement, before the layout is finalised.