{"id":13872,"date":"2026-09-12T15:30:00","date_gmt":"2026-09-12T15:30:00","guid":{"rendered":"https:\/\/www.electroluxprofessional.com\/au\/?p=13872"},"modified":"2026-11-23T09:14:07","modified_gmt":"2026-11-23T09:14:07","slug":"how-do-i-plan-commercial-laundry-equipment-for-a-new-facility","status":"publish","type":"post","link":"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/","title":{"rendered":"How Do I Plan Commercial Laundry Equipment for a New Facility?"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text]<\/p>\n<h2>Quick Answer<\/h2>\n<p>Plan commercial laundry equipment as one connected system. Define textile volumes and programs, map clean and soiled movement, balance washing, drying and finishing throughput, confirm utilities and access, and include commissioning, training, maintenance and downtime arrangements.<\/p>\n<h2>Define Demand and Textile Categories<\/h2>\n<p>Measure normal and peak dry textile weights, item types, soil categories, required programs, finishing standards and turnaround. Include expected growth without designing around an unrealistic maximum.<\/p>\n<h2>Map the Complete Workflow<\/h2>\n<p>Lay out receiving, sorting, washing, drying, ironing or finishing, folding and clean storage. Separate flows where required and provide room for trolleys, operators, cleaning and maintenance.<\/p>\n<h2>Balance Equipment and Infrastructure<\/h2>\n<ul>\n<li>Practical loads per hour<\/li>\n<li>Washer extraction and dryer demand<\/li>\n<li>Finishing capacity<\/li>\n<li>Power, gas, water, drainage and ventilation<\/li>\n<li>Delivery and future replacement access<\/li>\n<\/ul>\n<h2>Plan Support Before Opening<\/h2>\n<p>Review our <a href=\"https:\/\/www.electroluxprofessional.com\/au\/commercial-laundry-equipment\/\">commercial laundry equipment<\/a>, including commercial washers and commercial dryers. Then use our <a href=\"https:\/\/www.electroluxprofessional.com\/au\/customer-care\/\">Essentia Customer Care<\/a> to discuss commissioning, training and maintenance. Our guide to <a href=\"https:\/\/www.electroluxprofessional.com\/au\/how-to-plan-commercial-laundry-equipment-as-one-system\/\">planning commercial laundry equipment as one system<\/a> goes further.<\/p>\n<h2>Frequently Asked Questions<\/h2>\n<h3>What should be planned first?<\/h3>\n<p>Define textiles, volumes, programs, turnaround and workflow before selecting models.<\/p>\n<h3>How do I avoid equipment bottlenecks?<\/h3>\n<p>Compare practical throughput at washing, drying and finishing using representative programs.<\/p>\n<h3>Which infrastructure should be confirmed?<\/h3>\n<p>Check power, gas where applicable, water, drainage, ventilation, room conditions and physical access.<\/p>\n<h3>Why involve operators early?<\/h3>\n<p>They can identify handling, control, cleaning and access issues before the layout is fixed.<\/p>\n<h3>Where can an Australian business discuss its requirements?<\/h3>\n<p>Use our <a href=\"https:\/\/www.electroluxprofessional.com\/au\/sales-and-service-locator\/\">sales and service locator<\/a> to find an appropriate local contact.<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text] Quick Answer Plan commercial laundry equipment as one connected system. Define textile volumes and programs, map clean and soiled movement, balance washing, drying and finishing throughput, confirm utilities and access, and include commissioning, training, maintenance and downtime arrangements. Define Demand and Textile Categories Measure normal and peak dry textile weights, item types, soil categories, [&hellip;]<\/p>\n","protected":false},"author":283,"featured_media":13871,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[76,127],"tags":[],"class_list":["post-13872","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-commercial-laundries","category-laundry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Planning Commercial Laundry Equipment for a New Facility<\/title>\n<meta name=\"description\" content=\"Plan a new commercial laundry as one system: textiles and volumes, clean and soiled flow, balanced throughput, utilities and support.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Planning Commercial Laundry Equipment for a New Facility\" \/>\n<meta property=\"og:description\" content=\"Plan a new commercial laundry as one system: textiles and volumes, clean and soiled flow, balanced throughput, utilities and support.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/\" \/>\n<meta property=\"og:site_name\" content=\"Electrolux Professional Australia\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-12T15:30:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-23T09:14:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.electroluxprofessional.com\/au\/wp-content\/uploads\/2026\/11\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"675\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"steve@msmedia.com.sg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"steve@msmedia.com.sg\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\\\/\"},\"author\":{\"name\":\"steve@msmedia.com.sg\",\"@id\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/#\\\/schema\\\/person\\\/ab10b015f3631a5ae3459664d0213477\"},\"headline\":\"How Do I Plan Commercial Laundry Equipment for a New Facility?\",\"datePublished\":\"2026-09-12T15:30:00+00:00\",\"dateModified\":\"2026-11-23T09:14:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\\\/\"},\"wordCount\":280,\"image\":{\"@id\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility.jpg\",\"articleSection\":[\"Commercial Laundries\",\"Laundry\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\\\/\",\"url\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\\\/\",\"name\":\"Planning Commercial Laundry Equipment for a New Facility\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility.jpg\",\"datePublished\":\"2026-09-12T15:30:00+00:00\",\"dateModified\":\"2026-11-23T09:14:07+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/#\\\/schema\\\/person\\\/ab10b015f3631a5ae3459664d0213477\"},\"description\":\"Plan a new commercial laundry as one system: textiles and volumes, clean and soiled flow, balanced throughput, utilities and support.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility.jpg\",\"contentUrl\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility.jpg\",\"width\":1200,\"height\":675,\"caption\":\"Newly fitted commercial laundry with washers and stacked dryers, empty shelving and boxes\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How Do I Plan Commercial Laundry Equipment for a New Facility?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/#website\",\"url\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/\",\"name\":\"Electrolux Professional Australia\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/?src={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/#\\\/schema\\\/person\\\/ab10b015f3631a5ae3459664d0213477\",\"name\":\"steve@msmedia.com.sg\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ced6a901a0a514fa61cf4c3bcdd80d8992c322835a0a789713fe1b9306609f4e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ced6a901a0a514fa61cf4c3bcdd80d8992c322835a0a789713fe1b9306609f4e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ced6a901a0a514fa61cf4c3bcdd80d8992c322835a0a789713fe1b9306609f4e?s=96&d=mm&r=g\",\"caption\":\"steve@msmedia.com.sg\"},\"url\":\"https:\\\/\\\/www.electroluxprofessional.com\\\/au\\\/author\\\/steve-7\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Planning Commercial Laundry Equipment for a New Facility","description":"Plan a new commercial laundry as one system: textiles and volumes, clean and soiled flow, balanced throughput, utilities and support.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/","og_locale":"en_US","og_type":"article","og_title":"Planning Commercial Laundry Equipment for a New Facility","og_description":"Plan a new commercial laundry as one system: textiles and volumes, clean and soiled flow, balanced throughput, utilities and support.","og_url":"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/","og_site_name":"Electrolux Professional Australia","article_published_time":"2026-09-12T15:30:00+00:00","article_modified_time":"2026-11-23T09:14:07+00:00","og_image":[{"width":1200,"height":675,"url":"https:\/\/www.electroluxprofessional.com\/au\/wp-content\/uploads\/2026\/11\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility.jpg","type":"image\/jpeg"}],"author":"steve@msmedia.com.sg","twitter_card":"summary_large_image","twitter_misc":{"Written by":"steve@msmedia.com.sg","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/#article","isPartOf":{"@id":"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/"},"author":{"name":"steve@msmedia.com.sg","@id":"https:\/\/www.electroluxprofessional.com\/au\/#\/schema\/person\/ab10b015f3631a5ae3459664d0213477"},"headline":"How Do I Plan Commercial Laundry Equipment for a New Facility?","datePublished":"2026-09-12T15:30:00+00:00","dateModified":"2026-11-23T09:14:07+00:00","mainEntityOfPage":{"@id":"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/"},"wordCount":280,"image":{"@id":"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/#primaryimage"},"thumbnailUrl":"https:\/\/www.electroluxprofessional.com\/au\/wp-content\/uploads\/2026\/11\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility.jpg","articleSection":["Commercial Laundries","Laundry"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/","url":"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/","name":"Planning Commercial Laundry Equipment for a New Facility","isPartOf":{"@id":"https:\/\/www.electroluxprofessional.com\/au\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/#primaryimage"},"image":{"@id":"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/#primaryimage"},"thumbnailUrl":"https:\/\/www.electroluxprofessional.com\/au\/wp-content\/uploads\/2026\/11\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility.jpg","datePublished":"2026-09-12T15:30:00+00:00","dateModified":"2026-11-23T09:14:07+00:00","author":{"@id":"https:\/\/www.electroluxprofessional.com\/au\/#\/schema\/person\/ab10b015f3631a5ae3459664d0213477"},"description":"Plan a new commercial laundry as one system: textiles and volumes, clean and soiled flow, balanced throughput, utilities and support.","breadcrumb":{"@id":"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/#primaryimage","url":"https:\/\/www.electroluxprofessional.com\/au\/wp-content\/uploads\/2026\/11\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility.jpg","contentUrl":"https:\/\/www.electroluxprofessional.com\/au\/wp-content\/uploads\/2026\/11\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility.jpg","width":1200,"height":675,"caption":"Newly fitted commercial laundry with washers and stacked dryers, empty shelving and boxes"},{"@type":"BreadcrumbList","@id":"https:\/\/www.electroluxprofessional.com\/au\/how-do-i-plan-commercial-laundry-equipment-for-a-new-facility\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.electroluxprofessional.com\/au\/"},{"@type":"ListItem","position":2,"name":"How Do I Plan Commercial Laundry Equipment for a New Facility?"}]},{"@type":"WebSite","@id":"https:\/\/www.electroluxprofessional.com\/au\/#website","url":"https:\/\/www.electroluxprofessional.com\/au\/","name":"Electrolux Professional Australia","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.electroluxprofessional.com\/au\/?src={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/www.electroluxprofessional.com\/au\/#\/schema\/person\/ab10b015f3631a5ae3459664d0213477","name":"steve@msmedia.com.sg","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/ced6a901a0a514fa61cf4c3bcdd80d8992c322835a0a789713fe1b9306609f4e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ced6a901a0a514fa61cf4c3bcdd80d8992c322835a0a789713fe1b9306609f4e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ced6a901a0a514fa61cf4c3bcdd80d8992c322835a0a789713fe1b9306609f4e?s=96&d=mm&r=g","caption":"steve@msmedia.com.sg"},"url":"https:\/\/www.electroluxprofessional.com\/au\/author\/steve-7\/"}]}},"_links":{"self":[{"href":"https:\/\/www.electroluxprofessional.com\/au\/wp-json\/wp\/v2\/posts\/13872","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electroluxprofessional.com\/au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electroluxprofessional.com\/au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electroluxprofessional.com\/au\/wp-json\/wp\/v2\/users\/283"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electroluxprofessional.com\/au\/wp-json\/wp\/v2\/comments?post=13872"}],"version-history":[{"count":1,"href":"https:\/\/www.electroluxprofessional.com\/au\/wp-json\/wp\/v2\/posts\/13872\/revisions"}],"predecessor-version":[{"id":13873,"href":"https:\/\/www.electroluxprofessional.com\/au\/wp-json\/wp\/v2\/posts\/13872\/revisions\/13873"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electroluxprofessional.com\/au\/wp-json\/wp\/v2\/media\/13871"}],"wp:attachment":[{"href":"https:\/\/www.electroluxprofessional.com\/au\/wp-json\/wp\/v2\/media?parent=13872"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electroluxprofessional.com\/au\/wp-json\/wp\/v2\/categories?post=13872"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electroluxprofessional.com\/au\/wp-json\/wp\/v2\/tags?post=13872"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}